 |
 |
 |
 |
 |
 |
 |
 |
It is the policy of T. Sutcliffe & Co. Ltd., to provide its customers with products and services of the highest quality and reliability, consistent with sound economic consideration and commercial practices.
To achieve this goal, the company is committed to establishing and maintaining a formal Quality System which complies with the requirements of BS EN ISO 9002:2000 |
 |
|
| Industrial |
Sutcliffes started manufacturing precast concrete buildings by hand in 1950. With the
advent of modern technology automatic machines have taken the place of hard labour and
we now supply and erect specific buildings to meet our customers requirements. All the
buildings are manufactured at our works in Bolton and are delivered and erected by our
own experienced fitters.
Our buildings offer a viable alternative to traditional forms of construction being both economical and significantly quicker to install.
All our apex buildings utilise a Sutcliffe portal frame design which can be adapted for a variety of uses. |
 |
Parkside Daihatsu car showroom 19.050m x 10.973m x 2.642m high. Canterbury spar chippings, grey Plasticol Composite roof. |
 |
Coca Cola Edmonton fork lift maintenance bays 6.833m x 4.572m x 3.658m high. Canterbury Spar chippings and Poppy Red Plasticol cladding. |
 |
 |
|
|
| Finishes |
| Two pebble finishes are available to enhance the appearance |
| Canterbury |
Limestone |
 |
 |
|
|
Specially designed to your own requirements |
 |
Choice of canterbury or limestone chipping finish |
 |
Roof and wall cladding in plastisol Bs5427 (choice of colour) |
 |
Standard height to eaves 2.032m, 2.337m, 2.642m, 3.048m, 3.658m, 4.267m |
 |
Single span up to 9.144 m |
 |
Adaptable quick and economical |
|
|